Schedule for mockup assembly

Similar presentations


Presentation on theme: "Schedule for mockup assembly"— Presentation transcript:

1 Schedule for mockup assembly
1st week Nov 2nd week Nov 3rd week Nov 4th week Nov 4 5 6 7 10 11 12 13 14 17 18 19 20 21 24 25 26 27 28 Mockup assembly DAQ (백승록) PMT gain with Diffuse ball + MC (정인석, 김동현) Glove box (박강순, 정인석) LS filling (이재승, 박정식) N2 pursing Pre. Analysis SPE, gain measurement & HV setup Data taking & Analysis sealing LS filling fix the network PreparationOf Analysis Measurement of SPE, gain Source Calibration Data Analysis diffuse ball mount SPE with diffuse ball N2 Flush. Gd mass production and Loading ※ HV 1 대 고장(Ortec) 따라서 대체 모듈이 나올 때 까지 7채널(PMT) 제외  바닥 7채널 제외 ?

2 Glove box 설치 후 light sealing 완료 : 정인석
Mockup assembly Glove box 설치 후 light sealing 완료 : 정인석 dark current 데이터 획득 및 분석, 진행 중 : 백승록  일교차가 큰 요즘 온도 변화에 따른 dark current rate 변화 체크도 의미 있어 보임 N2 gas flushing (탱크) 및 air sealing 체크, 예정(오늘) : 이재승, 박강순, 정인석  비누거품을 이용한 체크, 체크 후 leak 부분 보완 Diffuse ball 설치 (2 set), 예정(오늘) : 김동현 설치 후 Glove box flushing, 예정 (내일) : 박강순, 정인석 LS purging, 예정(내일) : 이재승, 박강순  N2 Gas 주문 요 Mineral Oil 및 LS filling, 예정(모래 11/6 ~) : 이재승, 박강순, 정인석

3 Target & Gamma catcher (아크릴 검출기)
RENO Detector Target & Gamma catcher (아크릴 검출기)  지난 주 토요일 디자인 미팅에서 1차 세부 디자인 결정, 제작 업체와 2차 세부 미팅 예정(목요일) Buffer tank (스테인리스)  제조업체(거산)에서 1차 디자인 중. 수요일(11/5) 도면과 견적 제공 예정 Veto 바닥의 앙카(anchor) 설치  앙카제작 및 설치는 거산, 콘크리트 라이닝 가설은 대우엔지니어링  오늘 오후 2시 영광에서 3자 실무자 미팅 (김성현박사, 대우, 거산)  거산 측 앙카 설비 견적은 내일 탱크 견적과 같이 제공 예정