2nd ILC-Korean Workshop WG3 Accelerator Technology SRF Technology

Similar presentations


Presentation on theme: "2nd ILC-Korean Workshop WG3 Accelerator Technology SRF Technology"— Presentation transcript:

1 2nd ILC-Korean Workshop WG3 Accelerator Technology SRF Technology
Charge; WG3 SRF technology 국제적인 동향 및 기술 파악 한국의 참여전략 및 토의

2 WG3 (Accelerator Technology)의
이번 워크샵에서 WG3 (Accelerator Technology)의 Charge

3 Workshop Charge of 1st ILC Workshop at KEK
참고 Workshop Charge of 1st ILC Workshop at KEK - Initiate the work for the ILC (pre-GDI) after the technology choice of superconducting RF technology. - Review the Technical Issues with SC-LC. - Develop lists of design elements and decide whether they are 1. non-controversial in concept and may only need some optimization; or 2. should be considered open to reevaluation, in the conceptual design phase. - Work according to the list above. - Present the topics the different groups are interested in, and can contribute to the overall design

4 1. 빠른 시간 내에 우리나라의 참여 정도와 방향에 대하여 우리정부와 의견 조율 및 합의를 하고, ILC-Asia와 협의를 거쳐, ILC에 적극적으로 참여할 방법을 모색한다. 2. 참여 정도와 방향 제시를 위해서는 WG3 에서 토의를 거쳐 합의된 사항을 명확히 하여야 한다. (조직, 규모, 사람 등)

5 3. 토의와 합의의 기준은 ILC에 참여함으로써 우리나라 과학/공학/기술/산업이 얻을 수 있는 Benefit을 극대화 시킬 수 있는 방향이어야 한다. ….그러나…. 국내 여건은 ….. 포텐샬은 있다고 할 수 있지만, 구체적이고 실제적인 경험이 매우 미미한 상태이다. 4. 세계적인 동향파악 (essential parts but very briefly) - Time frame - Scale - 선진국들의 계획 또는 Proposal - Technical Issues

6 R&D Time Frame

7

8 Scale

9 Overall Layout under Study

10 ILC 건설비; CDR/TDR 후 그리고 대량 생산 산업화 정도에 따라 많은 변동이 예상됨. 현 시점에서 추산하고 비용 6~10 조 Good Starting Point for ILC  TESLA TDR Cost of TESLA-500 Machine cost; 3.2 B EURO XFEL; 0.24 B EURO Detector; 0.16~0.24 B EURO

11 TESLA

12

13 From 1st ILS Workshop at KEK Nov. 13~15, 2004 (D. Proch/DESY)

14 SMTF Meeting at Jefferson Laboratory, Sept. 2004
선진국의 계획 및 Proposal materials from 1st ILC at KEK, Nov. 2004 SMTF Meeting at Jefferson Laboratory, Sept. 2004

15 JAPAN

16

17

18

19

20

21

22

23 EU

24

25

26

27

28

29 DESY CMTB (Cryomodule Test Bench)

30 First operation/commissioning: Nov. 2005

31

32

33

34 USA

35

36

37

38

39

40

41

42

43 materials from 1st ILC at KEK
Technical Issues materials from 1st ILC at KEK

44

45

46

47

48 And many technical issues for ILC…..

49 토의

50 ILC의 SRF (cavity/cryomodule)에 한국의 참여
후발 참여국가로서 국내 과학계는 물론 산업계에 파급효과가 큰 좋은 참여 기회 그러나, 국내 경험 및 기반 구조는 매우 미미한 상태 국제 협력에 개방적이고, 협조적 협력의 최종 목적이 ILC cavity/cryomodule의 제작/시험만이어서는 안 된다.

51 과학/공학/기술적으로 개방적/다양한 참여 조직적/계획적 참여 적절한 통합적 management (과도한 통합 관리는 연구개발에 장애요인) 적극적 참여 로 미래의 가속기, SRF technology 등 더 나아가서는 대형과학/장치 개발 연구/사업기반 형성에 근간을 이룰 수 있는 전략을 추구한다. 국내 산업체의 개발 및 발전에 기여할 수 있도록 초기부터 적극 참여를 유도 국내 연구 기반/인력의 긴밀한 협조/협력/공동연구개발효율의 극대화

52 국내 기반 조성, R&D, 산업체 양산; 시기와 업무
Surface scanning on Nb sheet (RRR>300) Cell forming (Deep drawing) Chemical Cleaning & e-beam Welding Inspection & tuning Degreasing & Rinsing Cavity Processing Surface in a Clean room RF acceptance Test at 2K Insertion of couplers Cavity String Assembly In Clean room String Flanges & instruments Module completion Welding of Ti He Vessel Cryomodule Cold Mass Connection Final Alignment Installation of parts Forming & Welding Test