1 SungKyunKwan University
TiCAL project The 2nd ILC workshop 2004/12/28 Pohang Intae Yu SungKyunKwan University

2 Current Status Survey almost finished for the all the components
aimed all the components supplied in Korea Largely five components Tungsten, Scintillator, SiPM, Simulation package, readout electronics R & D has already been started for some parts expect very active R & D for the next two years 3 professors from Kobe, Shinshu and Niigata universities visited KNU on Dec 7 – 9 to discuss the cowork about TiCAL - development of SiPM - Readout - Scintillator - Physics simulation using current simulation tools, ( Mokka, Jupiter ..) Intae Yu Dec 28, 2004

3 Tungsten TaeguTec(전 대한중석회사)에서의 텅스텐 판 제작 가능성 타진
판 구조의 가능성 : Alloy, Heavy metal or other ??? W:Ni:Cu=95:3.5: Alloy WC + Cr heavy metal W:Pb = 7:3 ??? : new possibility 현재 100 mm by 100 mm 판 제작 가능. 성분 구성에 대한 모의시늉 등 연구 필요 W와 Pb 구성이면 매우 만들기 쉬움 – 모의시늉 필요 회사측과 연구/개발 협의 Intae Yu Dec 28, 2004

4 SiPM 한국/러시아/일본 공동연구 수행할 것임. Quantum Efficiency 향상 Noise level의 줄임
국내에서의 제작 Intae Yu Dec 28, 2004

5 Scintillator 1 cm 정도 폭의 strip 형태의 scintillator는 필연적임.
Fermilab 팀과 연구/개발하기로 합의 Light yield를 높이기 위한 성분 시험 Groove 디자인 등등 모든 scintillator의 제작 한국에서 가능 한국과 미국의 국제공동연구 형태이자 산학 연계 연구 Intae Yu Dec 28, 2004

6 Simulation Geant4 based Simulation packages are considered. : Mokka, Jupiter Mokka : installed - running successfully - geometry database installed at KNU - We are ready to open account to anyone interested in running physics. Jupiter : not yet - Japanese site doesn’t distribute official version yet - We asked cooperation when Japanese professors visited KNU - And we are also asked to cowork about physics simulations. As first stage, we are interested in physics simulation of SUSY using susygen3.0 and SUSY parameter scan. Intae Yu Dec 28, 2004

7 Mid term Plan Design optimization of TiCAL proto type
Scintillator, W, SiPM R & D at 2005 R & D of Readout Electronics Ready for physics simulation  need informations and discusstions with theory&physics working group Prototype beam test at Fermilab (summer, 2006) All the prototype specs == Made in Korea !!