PREPARING THE BID PACKAGE

Slides:



Advertisements
Similar presentations
소프트웨어 프로세스. 1 내용  소프트웨어 프로세스  생명주기의 의미  생명주기 모델 –Waterfall Model –prototyping model –Spiral Model –Iteration Model.
Advertisements

Original Laundry ­ room Items Wash bench / IronMaid ◀ 신모델 Multi- Drying cabinet ▲ 신상품 수입공급원 ㈜삼덕물산 HP PH
Marketing for Hospitality and Tourism 환대산업 마케팅의 개요 Chapter 1.
The Risk Management System 이 정 철 이 정 철. 목 차  INTORDUCTION  DEVELOPING A RISK MANAGEMENT FRAMEWORK  RISK IDENTIFICATION.
인증제도 혜택 광운대학교 김복기 교수.
뉴 욕 조 달 관 미국의 정부조달제도와 진출전략
포괄수가제 발전을 위한 과제 -원가체계구축 중심- 국민건강보험공단 지불제도개선팀.
CM 건설산업의 최고가치 구현수단으로서의 제2회 CM서울포럼 이상호 (한국건설산업연구원 건설정책연구실장)
번역관련 자격증 소개 및 시험 대비 안내 정 윤 희.
Seoul Jar Project SMVD | 양소은 | 정은지 Design P&R Assignment Concept Research.
National Computerization Agency
Journals & Conferences
The Introduction of SOC Credit Guarantee System (Oct. 2012)
건설생산시스템과 CM 건 설 교 통 부 건 설 관 리 과.
한반도 정세와 동북아 안보.
원가절감을 위한 구매전략 July 구매기획팀.
제8장 금융구조의 경제적 분석.
4. ITIL 개요 * ICT : Information & Communication Technology
English Communication 2
A-7.벤치마킹(Benchmarking)
건축물의 Life Cycle Cost 목원대학교 건축도시공학부 박 태 근.
원가관리(Cost Management)
뉴 욕 조 달 관 미국의 정부조달제도와 진출전략
EARNED VALUE MANAGEMENT
건설관리학 강의슬라이드 6장. 원가관리.
[멀티미디어 문서구조화특론 ] Workflow
API ICP 소개 (미국석유협회 개인자격프로그램) American Petroleum Institute Individual Certification Programs (ICP) 대상 : 부경대학교 일시 : (수) 15시~ 강사 : 네이버 배관정복.
외국인과 대화를~~ 대학에서 교환학생을~~
English Communication 1
위험도 관리 및 의사결정론 한양대학교 건설관리학과.
파생금융상품시장의 동향과 전망 -수익률 곡선과 통화스왑 베이시스를 중심으로
ISO 9001:2000 프로세스 접근방법의 이해와 적용 베스트경영컨설팅(BMC).
Program Management - Program and Project Definition -
Program Management - Concepts of Project Delivery -
제 14 장 거시경제학의 개관 PowerPoint® Slides by Can Erbil
1 도시차원의 쇠퇴실태와 경향 Trends and Features of Urban Decline in Korea
유라시아 부패와 사회네트워크.
숭실대학교 마이닝연구실 김완섭 2009년 2월 8일 아이디어  - 상관분석에 대한 연구
CM 제도 및 활용 방안 이 유 섭 (Ph.D. 수석연구원) 한 국 건 설 기 술 연 구 원.
Chapter 12. 프로젝트 조달관리 (Project Procurement Management)
Human Resource Management
THE COMMON THREAD IS MANAGEMENT MANAGEMENT IS THE KEY TO SUCCESS
의약품 급여 결정 과정에서 경제성평가의 활용 이 소 영 건강보험심사평가원 약제관리실.
프로젝트 관리 Project Management
제 15 장 거시경제의 측정 PowerPoint® Slides by Can Erbil
패러다임과 과학혁명.
ERP 시스템의 구축 ERP 시스템의 구축 기업이 ERP 시스템의 도입을 검토하는 단계에서부터 실제 업무에 적용하고 사후관리에 들어가는 단계에 이르기까지 시스템을 효과적으로 사용하기 위해 필요한 모든 활동.
미국 화재폭발조사관(CFEI) 자격제도
Department of AD & PR, Youngsan University
적산 견적 Part 1 견적의 정의 서울대학교 건축학과 이현수 교수.
생산운영관리 입문 CHAPTER01 (Introduction to Operations Management)
제4장 : 노동력 구조 1. 한국의 노동력 구조 2. 일본의 노동력구조 3. 유럽의 노동력 구조 4. 노동력 구조의 변화와 정책방향 동영상 학습과제 1. 노동력 구조와 의미는? 2. 각국의 노동력 구조를 조사하는 방법은? 3. 각국의 노동력 구조의 변화추이는? 4.
프로젝트 품질관리 품질 계획 품질 보증 품질 관리.
: 부정(negative)의 의미를 나타내는 접두사
시스템 분석 및 설계 글로컬 IT 학과 김정기.
제 세 동.
(주)신원데이터넷 ICE eBook (주)신원데이터넷
-았/었을 때 한국어를 처음 배웠을 때 뭐가 제일 어려웠어요? 발음이 어려웠어요.
CM 및 VE제도의 효율적 활용방안 동 아 대 학 교 건 축 학 부 교 수 이 학 기.
이산수학(Discrete Mathematics)
소프트웨어 종합설계 (Software Capstone Design)
CHAPTER 4 CONTRACTS.
CHAPTER 17 ESTIMATING PROCESS.
CHAPTER 7 PROJECT PLANNING.
CHAPTER 1 OPERATIONS MANAGEMENT
CHAPTER 9 SCHEDULING: PROGRAM EVALUATION AND REVIEW
매수인의 의무 대금지급의무 물품수령의무 물품검사 • 통지의무 계약상 대금 지급의무(53조): 계약에 따른 대금지급의 시기와
CHAPTER 12 PROJECT CASH FLOW.
Chapter 4. Energy and Potential
Chapter 7: Deadlocks.
Presentation transcript:

PREPARING THE BID PACKAGE CHAPTER 2 PREPARING THE BID PACKAGE

2.1 Project Concept and Need Design/Build 방식 요구사항 정의 개념설계 개념설계 승인 예비/상세 설계 입찰서류 완료 선정 통보 시공자 선정 제안 접수 입찰 공고 입찰 결정 시공 준공 FIGURE 2.1 Project development cycle for new project Private & public projects Private : Manufacturing plants, hospitals, research laboratories, hotels and commercial buildings, communications networks etc. public : Bridges, tunnels, transportation facilities, dikes, and dams etc. 수로

2.2 Establishing Need The first step in any project is the establishment of a need and a conceptual definition and refinement of the facility that will meet that need. 제품수요시장 조사, 타당성분석(Feasibility Study), 비용분석 자금제공자의 요구에 의해 타당성 분석의 내용이 결정: 자금제공자가 사업 타당성에 대한 근거를 요청

2.3 Formal Need Evaluation Deciding whether or not to proceed with the preliminary and final design Cost/benefit analysis Graphical representation of the project (e.g., sketch or artist’s rendering) and a layout diagram of the facility Cost estimate based on the conceptual-level information available Benefit Tangible (직접적인 효과) Intangible (간접적인 효과)

2.4 Conceptual Drawings and Estimates Conceptual documentation to potential funding sources (e.g., banks and investors) A cost estimate based on the conceptual drawings and other design information (e.g., square footage of roof area, floor space, size of heating and air-conditioning units, etc.) is prepared. A projection of cost to the future date on which construction will begin is required. The projection is made using the Engineering News-Record (ENR) indexes of basic construction cost. 건설관련 물가상승률 정보 제공

2.4 Conceptual Drawings and Estimates 군 우체국 프로젝트 사례 FIGURE 2.2 Project proposal: layout sketch and outline specification Military Post Office Project

2.4 Conceptual Drawings and Estimates 군 우체국 프로젝트 사례 필요 예산 FIGURE 2.3 Current working estimate for budget purposes

2.4 Conceptual Drawings and Estimates 목재 FIGURE 2.4 Engineering News-Record construction cost indices

2.5 Preliminary and Detail Design The drawings are a graphical or schematic indication of the work to be accomplished. The specifications are a verbal or word description of what is to be constructed and to what levels of quality. When completed, they are included as legally binding elements of the contract. The design team leader coordinates the efforts of architects and engineers from differing disciplines. The disciplines normally identified are architectural, civil and structural, mechanical, and electrical.

2.6 Notice to Bidders Because of his commitment to the owner to design a facility that can be constructed within a given budget and at an acceptable level of quality, the architect/engineer wants to be sure that the lowest bid price is achieved. 입찰 제공 정보 : the general type and size of the project, the availability of plans and specifications for review, and the time, place, and date of the bid opening. In some large cities, a builder’s exchange may operate to serve the contracting community.  예) 나라장터 (FedBizOpps.gov) Paid services such as Dodge BidPro (©Dodge Data & Analytics) provide detailed information customizable by date, geographic area, type of project, and other customizable parameters.  유료 입찰 서비스

FIGURE 2.5 Typical notice to bidders 병원 하수도 개선 프로젝트 사례 2.6 Notice to Bidders FIGURE 2.5 Typical notice to bidders

FIGURE 2.6 Example of FedBizOpps.gov available project listing 2.6 Notice to Bidders FIGURE 2.6 Example of FedBizOpps.gov available project listing

FIGURE 2.7 Bid package documents The documents that are available to the contractor and on which he must make a decision to bid or not to bid are those in the bid package. In addition to the plans and technical specifications, the bid package prepared by the A/E consists of a proposal form, general conditions that cover procedures common to all construction contracts, and special conditions, which pertain to procedures to be used that are unique to this particular project. All supporting documents are included by reference in the proposal form. FIGURE 2.7 Bid package documents

2.7 Bid Package Bid package  Bid Form  Award of Contract(Notice of Award)  Notice to Proceed Builder Contractor Builder Contractor The prices at which the work will be constructed can be stated either as lump-sum or as unit-price figures. In many instances, the project duration in working or calendar days is specified in the special conditions portion of the bid package.

FIGURE 2.8 Example proposal form 2.7 Bid Package FIGURE 2.8 Example proposal form

2.8 General Conditions A committee for engineer documents has been formed jointly by the American Consulting Engineers Council, the National Society of Professional Engineers, and the American Society of Civil Engineers to prepare standard contract documents. The committee is called the Engineers Joint Contract Documents Committee (EJCDC). These documents have been endorsed by the Associate General Contractors (AGC) of America and the Construction Specifications Institute (CSI) The rights, privileges, and responsibilities that accrue to the primary contractual parties in any construction contract are also defined in the general conditions. Therefore, sections pertaining to the (1) owner, (2) architect (or architect/ engineer), (3) contractor, and (4) subcontractors are typically found in the general conditions. 국가를 당사자로 하는 계약에 관한 법률, 시행령, 시행규칙

2.8 General Conditions American Institute of Architects (AIA)’s general conditions are listed below: 1. Definitions 2. Preliminary matters 3. Contract documents 4. Bonds and insurance 5. Contractor’s responsibilities 6. Owner’s responsibilities 7. Engineer’s responsibilities 8. Changes in the work 9. Change of contract price 10. Change of contract times 11. Test and inspections 12. Payments to contractor and completion 13. Suspension of work and termination 14. Dispute resolution

2.9 Supplementary Conditions Modifications to the basic articles of the general condition in the form of additions, deletions, or substitutions. Additional articles of a contractual-legal nature that may be desirable or necessary for a particular project.

2.9 Supplementary Conditions FIGURE 2.9 Special conditions: typical index of special conditions

2.10 Technical Specifications The contract documents must convey the requirements of the project to potential bidders and establish a legally precise picture of the technical aspects of the work to be performed. This is accomplished visually through the use of drawings. A verbal description of the technical requirements is established in the technical specifications. 시방서

2.10 Technical Specifications A typical index of specifications for a heavy construction project might appear as follows: 1. Clearing and grubbing 2. Removal of existing structures 3. Excavation and fill 4. Sheet steel piling 5. Stone protection 6. Concrete 7. Miscellaneous items of work 8. Metal work fabrication 9. Water supply facilities 10. Painting 11. Seeding 토목공사표준일반시방서 총칙 토공사 구조물 기초공사 콘크리트공사 일반 강구조물공사 방수 및 지수공사 부지시설공사

2.10 Technical Specifications FIGURE 2.10 Typical references to structural inspection and testing standards

참고. 국내 건설공사기준 표준시방서 전문시방서 설계기준 국토교통부 건설기술정보시스템 http://www.codil.or.kr/ 가설공사 표준시방서 강구조공사 표준시방서 건설공사 비탈면 표준시방서 건설환경관리 표준시방서 건축공사 표준시방서 건축기계설비공사 표준시방서 건축전기설비공사 표준시방서 공동구 표준시방서 농업토목공사 표준시방서 도로공사 표준시방서 도로교 표준시방서 도시철도공사(지하철) 표준시방서 산업·환경설비공사 표준시방서 상수도공사 표준시방서 조경공사 표준시방서 콘크리트 표준시방서 터널 표준시방서 토목공사 표준일반시방서 하천공사 표준시방서 항만 및 어항공사 표준시방서 하수관거공사 표준시방서 LH 전문시방서 고속도로공사 전문시방서 농어촌정비공사 전문시방서 댐 및 상수도공사 전문시방서 서울특별시 전문시방서 철도공사 전문시방서 항만 및 어항공사 전문시방서 행복도시건설공사 전문시방서 일반국도 전문시방서 강구조 설계기준 건설공사 비탈면 설계기준 건축 구조기준 건축기계설비 설계기준 건축전기설비 설계기준 공동구 설계기준 구조물기초 설계기준 농업생산기반정비사업계획 설계기준 댐 설계기준 도로 설계기준 도로교 설계기준 상수도 시설기준 조경 설계기준 철도 설계기준 콘크리트 구조기준 터널 설계기준 하수도 시설기준 하천 설계기준·해설 항만 및 어항 설계기준 국토교통부 건설기술정보시스템 http://www.codil.or.kr/ 한국건설기술연구원 국가건설기준센터 http://www.kcsc.re.kr/

2.11 Addenda 변경사항 공지 The bid package documents represent a description of the project to be constructed. They also spell out the responsibilities of the various parties to the contract and the manner in which the contract will be administered. Any changes in detail, additions, corrections, and contract conditions that arise before bids are opened that are intended to become part of the bid package and the basis for bidding are incorporated into the bid package through addenda.

2.12 Decision to Bid Estimating is the process of looking into the future and trying to predict project costs and various resource requirements. Studies reveal the fact that the most frequent causes of contractor failure are incorrect and unrealistic estimating and bidding practices. Quantities of Materials  Direct Cost  Indirect Cost  Management and Overhead Cost  Total Cost A common rule of thumb states that the contractor’s estimating cost will be approximately 0.25% of the total bid price. 만약 평균적으로 4번 중 1번 낙찰이 된다면, 낙찰되는 계약 건에 응찰 시 3번의 비낙찰 시 소요된 비용을 포함하여 견적 제출  총 입찰 비용의 1% 만큼을 추가

2.13 Prequalification 발주자는 프로젝트를 수행할 능력이 없을 것 같은데 최저가를 제출한 계약자에 대해 고민! Each contractor interested in preparing and submitting a bid is asked to submit documents that establish his firm’s expertise and capability in accomplishing similar types of construction.

2.14 Subcontractor and Vendor Quotations/Contracts Prime Contractor Subcontractor(특수 공사: 터널, 교량, 전기, 기계, 통신 등) + Vendor(자재 공급) The contractor integrates these quotations from subcontractor and vendors into the total bid price.

2.15 Bid Bond 입찰보증금 : 낙찰자 계약 체결 거부 대비 A construction bond, therefore, involves a relationship between three parties: the principal or party who might default, the obligee or party who may be damaged or lose some advantage, and the surety who will offset the damage or loss of advantage. 만약 어떤 Contractor가 $3,000,000에 낙찰 받은 후 이행을 포기하여, 차 순위자인 $3,080,000에 응찰한 Contractor에게 낙찰되었다면, 발주자의 손해액 $80,000을 입찰보증금에서 충당. 입찰보증금은 통상 공사금액의 5% 수준. 보증금 FIGURE 2.11 Bonding relationship (three-party)

2.16 Performance and Payments Bonds If the contractor is awarded the contract, performance and payment bonds are issued. A performance bond (이행보증금: 낙찰자 공사 수행 거부 대비: Owner & Contractor) is issued to a contractor to guarantee the owner that the contract work will be completed and that it will comply with project specifications. Contractor  이행보증금  Owner In other words, a performance bond protects the owner against default on the part of the contractor in performing the project as required. A payment bond (지불보증금: 주계약자 공사대금 지불 불능 상황 대비: Prime Contractor & Subcontractor, Vendor) is issued to guarantee the owner protection against any liens or charges against the project that are unpaid as a result of the contractor’s default. Prime Contractor  지불보증금  Subcontractor, Vendor Contractor 파산 시 Subcontractor와 Vendor에게 대금 지급용으로 사용, Contractor 유동성 위기 시 자금 지원 보증사는 해결사(Troubleshooters) DB를 보유  문제 발생 시 해결사를 즉시 투입하여 공사가 계속될 수 있도록 조치를 취해 Owner를 보호

2.17 Cost and Requirements for Bonds Performance and payment bonds are issued for a service charge. The common rate is 1% or $10 per $1,000 on the first $200,000 of contract cost. At higher contract costs, the rate is reduced incrementally. 보증보험 회사는 이행보증금 집행 시 보험 가입자 및 관계자에게 구상권을 청구한다. The Miller Act (enacted in 1935) establishes the level of bonding required for federally funded projects. Performance bonds must cover 100% of the contractor amount while payment bonds are required based on a sliding scale as follows: 1. 50% if the contract is $1 million or less 전체 공사 금액의 50%를 커버할 수 있는 보증보험 요구 2. 40% if the contract is between $1 and $5 million 3. Fixed amount of $2.5 million if the contract is greater than $5 million